UFGS 01 58 00 Project Identification  

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2022 N C 5

In response to CCR 11903, corrected placement of tailoring tags and updated specifier notes throughout.

May-2022 N C 4

Per CCR 11078, updated Construction Project Signs paragraph (1.4.3) tailored for ARMY and AIR FORCE to address project identification signs for Air Force projects managed by USACE.

Feb-2022 N C

In reference to CCR 11189, Project Sign Details (PDF and zip files) found under Related Materials have been updated. Classified as a clerical change.

Nov-2021 N C 3

In response to CCR 9882, instructions have been added for Air Force projects on Guam, on both Navy installation with NAVFAC execution and Army installation with USACE execution. Also, clarified Air Force instruction in the first Note in the Project Identification Signboard paragraph.

Nov-2020 N C 2

[Update 3/18/21: per CCR# 9845, reference to ARRA has been removed from the sign details in all Related Materials.]
Updated both the Specifier Note under PROJECT IDENTIFICATION SIGN (1.4) and the Related Materials (PDF/ZIP attachments)

Aug-2020 N C 1

In response to CCR 8950, revised Specifier Note in paragraph Quality Control (1.3) for additional guidance.

Aug-2019 N R

Complete review and update

Aug-2009 N R

Minor revisions

Aug-2008 N R

Corrected URL hyperlinks

Apr-2008 N R

Updated Project Sign requirements

Jan-2008 N R

Added requirements for Facility Recognition Plaque

Jan-2007 N R

Revised link to NAVFAC logo