UFGS 01 50 00 Temporary Construction Facilities and Controls  

Date: 
11-01-2020
Division: 
Division 01 - General Requirements
Status: 
Active

The Related Materials are available in the following formats:
 Adobe Acrobat (PDF) |   Microsoft Word (DOCX)

Page(s): 
26

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2022 A C 2

Incorporated CCRs 10035, 10883, and 10885.

Aug-2021 A C 1

Added Note to Submittal Article with instructions for Navy Design-Build projects.

Nov-2020 A R

Revised to include NAVFAC Design-Build Division 01 tailoring options and CCRs.

Aug-2020 A C 4

Added notes for NAVFAC PAC requirements to paragraphs 1.2 and 2.2.1 in response to CCR 8831.

May-2020 A C 3

Added cybersecurity requirements during construction, paragraph 1.6, in response to CCR 7450.

Aug-2019 A C 2

Added tailoring option and editor's note to paragraph 3.6 in response to CCR 7602. Added reference tags and corrected character spacing in paragraph 1.5 in response to CCR 7624.

Feb-2019 A C 1

Corrected spelling errors in paragraphs 2.3.1 and 2.3.2 and deleted out of place measurements below paragraph 2.3.3 in response to CCR 7090.

May-2018 A R

Complete review and update.

Feb-2016 A C 3

Added provision for dumpsters tailored to NAVFAC SE

May-2015 A C 2

CCR 4158: Updated Fencing Paragraph a. to height requirements in EM 385-1-1.

Aug-2014 A C 1

Moved execution requirements to Part 3 as noted in CCR 3562

Aug-2009 A R

Revised USACE Project Sign requirements

Oct-2007 A N

Superseding UFGS 01 50 00.00 20 Temporary Facilities and Controls, UFGS 01 50 00.00 40 Temporary Facilities and Controls, and UFGS 01 50 02.00 10 Temporary Construction Facilities